After we had our shower re-tiled 6 years ago we thought our water troubles were over. But the contractor who did the work did such a poor job that we had cracked tiles, grout that had simply disintagrated, tile that had chipped away and water leaking behind the grout that was left. We had no choice but do the work again, this time using Bruce's stake executive secretary who is wonderful building contractor. He did the demolition work the second week of December and this is what it looked like when he took everything out (yes even all the walls and floor). When he took out the sub floor you could see daylight, which means the shower floor was never finished correctly. Todd filled the space, put in insulation and then a new floor. The glass contractor finished up installing the glass today and you can see what we now have. It is beautiful.